US EPA AWBERC Annex Addition
2008 Leed Gold Award Winner
US EPA AWBERC Annex Addition
2008 Leed Gold Award Winner
US EPA AWBERC Annex Addition
2008 Leed Gold Award Winner
US EPA AWBERC Annex Addition
2008 Leed Gold Award Winner
US EPA AWBERC Annex Addition
2008 Leed Gold Award Winner

US EPA AWBERC Annex Addition

Size: 400,000 SF Cost: $16,000,000

US EPA AWBERC Annex Addition

Cincinnati, OH

Designed as a LEED Gold facility, the plan for the annex additions involved the use of natural lighting, high efficiency HVAC and lighting design, recycled materials, high efficiency plumbing fixtures, and minimum site disturbance. A clerestory was designed to help with the height difference between the two buildings, while providing daylight to the offices within. In order to meet the EPA's design guidelines, the project included installation of blast resistant film on the glazing in the Annex and steel reinforcement of the curtain wall's aluminum framing.